Extensive renovation to the Olympic Stadium Tower, which included the removal of concrete panels that covered a large section of the tower walls that were replaced with floor to ceiling windows.
- TSC scanned the interior and exterior of the structure and created an as-built 3D model of the openings for the glass curtain walls and slab extensions.
- TSC release fabrication drawings to over 990 pieces of glass for the tower curtainwall system.